Elering(@EleringAS) 's Twitter Profileg
Elering

@EleringAS

An independent power and gas transmission system operator in Estonia whose main duty is to ensure the availability of a high-quality energy supply to consumers.

ID:1196393996471427072

linkhttp://www.elering.ee calendar_today18-11-2019 11:49:52

459 Tweets

554 Followers

294 Following

Elering(@EleringAS) 's Twitter Profile Photo

gas pipeline is successfully back in operation! 👏
🙏Big thanks to all who were involved and thanks to whom we managed to do the repair work in 7 months when usually this type of undersea work takes at least 1-2 years

#Balticconnector gas pipeline is successfully back in operation! 👏 🙏Big thanks to all who were involved and thanks to whom we managed to do the repair work in 7 months when usually this type of undersea work takes at least 1-2 years
account_circle
Elering(@EleringAS) 's Twitter Profile Photo

Repairs on have been successfully completed 👏
The pipeline will now be filled with gas and the interconnection between Estonia and Finland will be prepared for transporting natural gas.

Read more 👇
elering.ee/en/repairs-bal…

Repairs on #Balticconnector have been successfully completed 👏 The pipeline will now be filled with gas and the interconnection between Estonia and Finland will be prepared for transporting natural gas. Read more 👇 elering.ee/en/repairs-bal…
account_circle
Elering(@EleringAS) 's Twitter Profile Photo

Eleringi juht Kalle Kilk: Eleringi elektrivõrgu eelarenduse kontseptsioon on kasulik tarbijale, tootjale ja keskkonnale 👇

Loe lähemalt:
elering.ee/eleringi-blogi…

Eleringi juht Kalle Kilk: Eleringi elektrivõrgu eelarenduse kontseptsioon on kasulik tarbijale, tootjale ja keskkonnale 👇 Loe lähemalt: elering.ee/eleringi-blogi…
account_circle
Elering(@EleringAS) 's Twitter Profile Photo

Tartut ümbritseva maakaabli tõmbamine👇

👉Tartu ja Emajõe alajaama vahel hakkab rajatav maakaabel asendama 2,5 km pikkust õhuliini lõiku.
👉Tartu ja Ülejõe alajaamade vahele rajatakse täiesti uus kaabelliin pikkusega 6 km.

✔Kaablid saavad lõplikult valmis selle aasta lõpuks.

Tartut ümbritseva maakaabli tõmbamine👇 👉Tartu ja Emajõe alajaama vahel hakkab rajatav maakaabel asendama 2,5 km pikkust õhuliini lõiku. 👉Tartu ja Ülejõe alajaamade vahele rajatakse täiesti uus kaabelliin pikkusega 6 km. ✔Kaablid saavad lõplikult valmis selle aasta lõpuks.
account_circle
Elering(@EleringAS) 's Twitter Profile Photo

🦺 This week, together with partner teams, we are practicing how to set up an emergency restoration system in just a few hours.

⚡ The restoration system is supplied to us by the Canadian company SBB

account_circle
Elering(@EleringAS) 's Twitter Profile Photo

Balticconnector’s repair work completed – next, on to commissioning.👏
The preparatory work phases for the pipeline’s commissioning have begun, the implementation of which will take place from land areas in Estonia and Finland.
Read more: elering.ee/en/balticconne…

Balticconnector’s repair work completed – next, on to commissioning.👏 The preparatory work phases for the pipeline’s commissioning have begun, the implementation of which will take place from land areas in Estonia and Finland. Read more: elering.ee/en/balticconne…
account_circle
Elering(@EleringAS) 's Twitter Profile Photo

Lihulas käivad 330 kV alajaama ehitustööd 👇

Alajaam parandab võimalusi uute taastuvenergia tootmisvõimsuste liitmiseks Lääne-Eestis, mis omakorda panustab Eesti riigi 2030 taastuvenergia eemärkide täitmisse.
Jaam saab töövalmis 2025. aasta lõpuks.

account_circle
Elering(@EleringAS) 's Twitter Profile Photo

Viru sünkroonkompensaator pingestati edukalt 20.märtsil 👏
👉järgmisena toimub katsekäit aprilli keskel, kui kompensaatorit haldab Eleringi juhtimiskeskus ja toimuvad viimased katsetused ja verifitseerimised;
🤝lõplikult annab Siemens Energy jaama Eleringile üle mai lõpus.

Viru sünkroonkompensaator pingestati edukalt 20.märtsil 👏 👉järgmisena toimub katsekäit aprilli keskel, kui kompensaatorit haldab Eleringi juhtimiskeskus ja toimuvad viimased katsetused ja verifitseerimised; 🤝lõplikult annab @Siemens_Energy jaama Eleringile üle mai lõpus.
account_circle
Elering(@EleringAS) 's Twitter Profile Photo

Sel nädalal algasid Väikese väina teise merekaabli ehitustööd 👇

Kaabli valmides vabaneb Muhumaa ja Saaremaa vaheline tamm selle aasta lõpuks lõplikult ligikaudu 60 aasta vanusest kõrgepinge õhuliinist.

elering.ee/elering-alusta…

Sel nädalal algasid Väikese väina teise merekaabli ehitustööd 👇 Kaabli valmides vabaneb Muhumaa ja Saaremaa vaheline tamm selle aasta lõpuks lõplikult ligikaudu 60 aasta vanusest kõrgepinge õhuliinist. elering.ee/elering-alusta…
account_circle
Elering(@EleringAS) 's Twitter Profile Photo

Eleringi juhatuse esimees Kalle Kilk Reporteritunnis:
Eesti energiapoliitilised valikud ja taastuvenergiatoetused

Kuula saadet:
vikerraadio.err.ee/1609273067/rep…

account_circle
Elering(@EleringAS) 's Twitter Profile Photo

Viru-Tsirguliina õhuliini rekonstrueerimine edeneb plaanipäraselt👇

🗓️Kogu projekt on 2/3 osas valmis ning projekt on graafikus, et liin käesoleva aasta lõpus pingestada.
Viru-Tsirguliina ühendus on suur osa sünkroniseerimisest Mandri-Euroopaga.
CINEA🇪🇺

Viru-Tsirguliina õhuliini rekonstrueerimine edeneb plaanipäraselt👇 🗓️Kogu projekt on 2/3 osas valmis ning projekt on graafikus, et liin käesoleva aasta lõpus pingestada. Viru-Tsirguliina ühendus on suur osa sünkroniseerimisest Mandri-Euroopaga. @cinea_eu
account_circle
Gasgrid(@GasgridFinland) 's Twitter Profile Photo

's repairs progress as planned. The damaged pipe section was removed, and remaining section is in place. Repairs continue until the beginning of April. Estimated commissioning is 22.4. provided that works proceed as planned. Read more: bit.ly/3wVWIac

#Balticconnector's repairs progress as planned. The damaged pipe section was removed, and remaining section is in place. Repairs continue until the beginning of April. Estimated commissioning is 22.4. provided that works proceed as planned. Read more: bit.ly/3wVWIac
account_circle
Elering(@EleringAS) 's Twitter Profile Photo

Läti minister külastas Pakrineeme sadamat ja gaasitaristut ning sai ülevaate LNG vastuvõtuvõimekusega seonduvast. 👇

Läti minister külastas Pakrineeme sadamat ja gaasitaristut ning sai ülevaate LNG vastuvõtuvõimekusega seonduvast. 👇
account_circle
Elering(@EleringAS) 's Twitter Profile Photo

💡Utilitas on esimene Eestis, kelle Elering tunnistas manuaalse sageduse taastamise reservi (mFRR) pakkujana Euroopa sagedusjuhtimise platvormi nõuetele vastavaks elering.ee/elering-eelkva…

💡Utilitas on esimene Eestis, kelle Elering tunnistas manuaalse sageduse taastamise reservi (mFRR) pakkujana Euroopa sagedusjuhtimise platvormi nõuetele vastavaks elering.ee/elering-eelkva…
account_circle
Elering(@EleringAS) 's Twitter Profile Photo

Preparations for Balticconnector’s repair works have progressed according to plan and on schedule in cooperation with Elering & Gasgrid. The repair works at the damage site start this week. 👏
The estimated commissioning date is 22.04.
Read more: gasgrid.fi/en/2024/03/05/…

Preparations for Balticconnector’s repair works have progressed according to plan and on schedule in cooperation with Elering & @GasgridFinland. The repair works at the damage site start this week. 👏 The estimated commissioning date is 22.04. Read more: gasgrid.fi/en/2024/03/05/…
account_circle
Elering(@EleringAS) 's Twitter Profile Photo

On 08.12.2023 Elering launched a public consultation for long-term procurement of balancing capacity, garnering valuable feedback. The updated concept document and summary of feedback, along with Elering's comments are here: elering.ee/sagedusreservi…
More info available via email.

On 08.12.2023 Elering launched a public consultation for long-term procurement of balancing capacity, garnering valuable feedback. The updated concept document and summary of feedback, along with Elering's comments are here: elering.ee/sagedusreservi… More info available via email.
account_circle
Elering(@EleringAS) 's Twitter Profile Photo

Eleringi juhatuse liige Erkki Sapp sünkroniseerimisest Mandri-Euroopaga: märkamatu tarbijale, uus võimalus tootjale 👇

toostusest.ee/uudis/2024/02/…

Eleringi juhatuse liige Erkki Sapp sünkroniseerimisest Mandri-Euroopaga: märkamatu tarbijale, uus võimalus tootjale 👇 toostusest.ee/uudis/2024/02/…
account_circle
Elering(@EleringAS) 's Twitter Profile Photo

Eilsel energeetikakonverentsil rääkis Eleringi juhatuse esimees Kalle Kilk varustuskindluse tagamise võimalustest tuleviku energeetikas.

Vaata ka intervjuud sünkroniseerimise teemal: tuled jäävad põlema igal juhul!
arileht.delfi.ee/artikkel/12027…

Fotod: Karli Saul/Delfi Meedia

Eilsel energeetikakonverentsil rääkis Eleringi juhatuse esimees Kalle Kilk varustuskindluse tagamise võimalustest tuleviku energeetikas. Vaata ka intervjuud sünkroniseerimise teemal: tuled jäävad põlema igal juhul! arileht.delfi.ee/artikkel/12027… Fotod: Karli Saul/Delfi Meedia
account_circle
Elering(@EleringAS) 's Twitter Profile Photo

⚡ Riik alustab Eesti-Läti neljanda elektriühenduse planeerimisega

Ühendus peaks valmima 2033 aastal ja panustab 2050 kliimaaeesmärkide täitmisesse.
Planeerimisprotsess on avalik ja igaühel on õigus selles osaleda.

Loe rohkem siit:
agri.ee/uudised/riik-a…

⚡ Riik alustab Eesti-Läti neljanda elektriühenduse planeerimisega Ühendus peaks valmima 2033 aastal ja panustab 2050 kliimaaeesmärkide täitmisesse. Planeerimisprotsess on avalik ja igaühel on õigus selles osaleda. Loe rohkem siit: agri.ee/uudised/riik-a…
account_circle
Elering(@EleringAS) 's Twitter Profile Photo

Balticconnector's repair work is planned to start at the beginning of March. The estimated duration of the repair is 4 weeks but depends on the ice conditions. After that the pipe will be inspected and commissioned.
Gasgrid
elering.ee/en/balticconne…

Balticconnector's repair work is planned to start at the beginning of March. The estimated duration of the repair is 4 weeks but depends on the ice conditions. After that the pipe will be inspected and commissioned. @GasgridFinland elering.ee/en/balticconne…
account_circle